April 19 – Set Building Starts

Three men putting together wooden frames

Three men building wooden frames

We have been trying out the construction of the set for “The Return of the Native” with the stage management team Mike Lofthouse and Andrew Munro at Max Gate.

As we take the performance to several locations, the set has to be designed to both enhance the drama of the play, and to be adaptable and able to be dismantled speedily after performances.

Model with two plastic figures, being a series of hurdles arranged to form a stage area

This is our model of the set with scale figures not yet in costume!

Advertisement

Comments are closed.

Create a free website or blog at WordPress.com.

Up ↑

%d bloggers like this: